<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>O&#38;P Street Construction</title>
	<atom:link href="http://fixingoandpstreets.com/feed/" rel="self" type="application/rss+xml" />
	<link>http://fixingoandpstreets.com</link>
	<description>Brought to you by DDOT DC</description>
	<lastBuildDate>Fri, 18 May 2012 19:59:32 +0000</lastBuildDate>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.2.1</generator>
		<item>
		<title>May 18 Update</title>
		<link>http://fixingoandpstreets.com/may-18-update/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=may-18-update</link>
		<comments>http://fixingoandpstreets.com/may-18-update/#comments</comments>
		<pubDate>Fri, 18 May 2012 19:59:32 +0000</pubDate>
		<dc:creator>mhughes</dc:creator>
				<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://fixingoandpstreets.com/?p=443</guid>
		<description><![CDATA[<h2>Look-Ahead Update</h2>
<h3>Special Notes:</h3>
<blockquote>
<blockquote>
<h2 style="text-align: left; padding-left: 30px;"><span style="color: #ff0000;">Saturday work is currently scheduled for May 19</span></h2>
</blockquote>
</blockquote>
<h3>Updated 5-18-12:</h3>
<ul>
	<li>
<h2>All scheduled dates shown are dependent on weather conditions and subject to change.</h2>
<img class="aligncenter size-full wp-image-445" title="Two Week Look Ahead 05-18-12-01" src="http://fixingoandpstreets.com/wp-content/uploads/2012/05/Two-Week-Look-Ahead-05-18-12-011.jpg" alt="" width="550" height="177" /></li>]]></description>
			<content:encoded><![CDATA[<h2>Look-Ahead Update</h2>
<h3>Special Notes:</h3>
<blockquote>
<blockquote>
<h2 style="text-align: left; padding-left: 30px;"><span style="color: #ff0000;">Saturday work is currently scheduled for May 19</span></h2>
</blockquote>
</blockquote>
<h3>Updated 5-18-12:</h3>
<ul>
<li>
<h2>All scheduled dates shown are dependent on weather conditions and subject to change.</h2>
<p><img class="aligncenter size-full wp-image-445" title="Two Week Look Ahead 05-18-12-01" src="http://fixingoandpstreets.com/wp-content/uploads/2012/05/Two-Week-Look-Ahead-05-18-12-011.jpg" alt="" width="550" height="177" /></li>
</ul>
<h2>Location &amp; Work</h2>
<h3>P Street:</h3>
<h4>3200 Block of P Street (South Side)</h4>
<ul>
<li>Install cobblestones on roadway at tracks (May 18-May 25)</li>
<li>Install grout at tracks (May 21-May25)</li>
</ul>
<h3>O Street:</h3>
<h4>33rd and O Street (Northwest Corner)</h4>
<ul>
<li>Roadway excavation, aggregate base and geofabric (May 18-May 22)</li>
<li>Install cement base (May 23)</li>
</ul>
<h4>3300 Block of O Street (North Side)</h4>
<ul>
<li>Demolition cement base at yokes (May 18-May 25)</li>
<li>Install brick sidewalk and driveways (May 18-May 25)</li>
<li>Install cement (May 21 and May 23)</li>
<li>Install cobblestones on roadway and gutter (May 21-May 25)</li>
</ul>
<h4>3400 Block of O Street (South Side)</h4>
<ul>
<li>Install streetcar tracks, manholes, and junction boxes (May 18-May 25)</li>
<li>Install cobblestones on roadway and gutter (May 18-May 19)</li>
<li>Install brick sidewalk and driveways (May 18-May 19)</li>
</ul>
<h4>34th and O Street (Southwest Corner)</h4>
<ul>
<li>Install granite curb, wheelchair ramps, brick gutter and brick sidewalk (May 18-May 19)</li>
<li>Remove traffic barriers and open roadway (May 19)</li>
</ul>
]]></content:encoded>
			<wfw:commentRss></wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>May 8 Update</title>
		<link>http://fixingoandpstreets.com/may-8-update/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=may-8-update</link>
		<comments>http://fixingoandpstreets.com/may-8-update/#comments</comments>
		<pubDate>Tue, 08 May 2012 22:12:58 +0000</pubDate>
		<dc:creator>mhughes</dc:creator>
				<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://fixingoandpstreets.com/?p=435</guid>
		<description><![CDATA[<h2>Look-Ahead Update</h2>
<h3>Special Notes:</h3>
<blockquote>
<blockquote>
<h2 style="text-align: left; padding-left: 30px;"><span style="color: #ff0000;">As part of the O&#38;P Street Rehabilitation project, street lights within the project zone are being updated or, in many cases, added. In response to public concern for safety, the finalized lighting plan increases current lighting by 40% while still preserving the historic feel of the area. You may notice a new light fixture or foundation for a new light fixture near an existing light. In many cases, the existing light will be removed at a later time. Many of the new foundations are covered with orange drums. These drums are in place for pedestrian safety and will be removed once the light poles are installed.</span></h2>
</blockquote>
</blockquote>
<h2 style="text-align: left; padding-left: 30px;"><span style="color: #ff0000;">When the new lights are operational, you may notice a significant increase in brightness the first couple of nights. Per DDOT’s policy, any existing street lights designated for removal will stay turned on until we verify all of the new lights are fully operational. Once they are deemed as such, the existing lights designated for removal will be turned off. We appreciate your understanding during this time.
</span></h2>
<h2 style="text-align: left; padding-left: 30px;"><span style="color: #ff0000;">Should you have questions regarding the lighting plan or a concern about a specific light near your property, please contact the project team at <a href="mailto:info@fixingOandPstreets.com">info@fixingOandPstreets.com</a>. Be sure to include your address so that we may address your specific question or issue appropriately.
</span></h2>
<h3>Updated 5-8-12:</h3>
<ul>
	<li>
<h2>All scheduled dates shown are dependent on weather conditions and subject to change.</h2>
<img class="aligncenter size-full wp-image-436" title="Two Week Look Ahead 05-8-12-01" src="http://fixingoandpstreets.com/wp-content/uploads/2012/05/Two-Week-Look-Ahead-05-8-12-01.jpg" alt="" width="550" height="177" /></li>]]></description>
			<content:encoded><![CDATA[<h2>Look-Ahead Update</h2>
<h3>Special Notes:</h3>
<blockquote>
<blockquote>
<h2 style="text-align: left; padding-left: 30px;"><span style="color: #ff0000;">As part of the O&amp;P Street Rehabilitation project, street lights within the project zone are being updated or, in many cases, added. In response to public concern for safety, the finalized lighting plan increases current lighting by 40% while still preserving the historic feel of the area. You may notice a new light fixture or foundation for a new light fixture near an existing light. In many cases, the existing light will be removed at a later time. Many of the new foundations are covered with orange drums. These drums are in place for pedestrian safety and will be removed once the light poles are installed.</span></h2>
</blockquote>
</blockquote>
<h2 style="text-align: left; padding-left: 30px;"><span style="color: #ff0000;">Once the new light has been installed and is operational, should the brightness of the light interfere with your evening routine, please contact us. DDOT will send a team to evaluate the light and will be able to make recommendations on how to lessen the impact to your home. Different options could include a shade or adjusting the wattage.</span></h2>
<h2 style="text-align: left; padding-left: 30px;"><span style="color: #ff0000;">Please keep in mind that there could be unusual brightness the first night or two once the new lights are turned on. Per DDOT&#8217;s policy, any existing street lights designated for removal will stay turned on until we verify all of the new lights are fully operational. Once they are deemed as such, the existing lights designated for removal will be turned off. </span></h2>
<h2 style="text-align: left; padding-left: 30px;"><span style="color: #ff0000;">We thank you for your flexibility and patience during this brief transition as we ensure a well-lit neighborhood for your safety and enjoyment.</span></h2>
<h2 style="text-align: left; padding-left: 30px;"><span style="color: #ff0000;">Should you have questions regarding the lighting plan or a concern about a specific light near your property, please contact the project team at <a href="mailto:info@fixingOandPstreets.com">info@fixingOandPstreets.com</a>. Be sure to include your address so that we may address your specific question or issue appropriately.<br />
</span></h2>
<h3>Updated 5-8-12:</h3>
<ul>
<li>
<h2>All scheduled dates shown are dependent on weather conditions and subject to change.</h2>
<p><img class="aligncenter size-full wp-image-436" title="Two Week Look Ahead 05-8-12-01" src="http://fixingoandpstreets.com/wp-content/uploads/2012/05/Two-Week-Look-Ahead-05-8-12-01.jpg" alt="" width="550" height="177" /></li>
</ul>
<h2>Location &amp; Work</h2>
<h3>P Street:</h3>
<h4>3200 Block of P Street (South Side)</h4>
<ul>
<li>Install streetcar tracks, manholes and junction boxes (May 8-May 9)</li>
<li>Install cobblestone on roadway at tracks (May 8-May 18)</li>
<li>Install cement base at tracks (May 10)</li>
<li>Install streetlight foundations (May 8)</li>
</ul>
<h4>3200 Block of P Street (Northside &#8211; between alley &amp; Wisconsin Ave.)</h4>
<ul>
<li>Install granite curb, wheelchair ramps, brick gutter and brick sidewalk (May 8-May 10)</li>
</ul>
<h3>O Street:</h3>
<h4>33rd and O Street (Northwest Corner)</h4>
<ul>
<li>Set traffic barriers (May 14)</li>
<li>Roadway excavation, aggregate base and geofabric (May 14-May 16)</li>
<li>Install cement base (May 16)</li>
<li>Install granite curb, wheelchair ramps, brick gutter and brick sidewalk (May 17-May 18)</li>
</ul>
<h4>3300 Block of O Street (North Side)</h4>
<ul>
<li>Demolition cement base at yokes (May 8-May 18)</li>
<li>Install brick sidewalk and driveways (May 14-May 18)</li>
<li>Install cement (May 14)</li>
<li>Install cobblestones on roadway and gutter (May 14-May 18)</li>
</ul>
<h4>3400 Block of O Street (South Side)</h4>
<ul>
<li>Install streetcar tracks (May 8-May 18)</li>
<li>Install cobblestones on roadway and gutter (May 10-May 18)</li>
<li>Install brick sidewalk and driveways (May 11-May 18)</li>
<li>Install streetlight foundations (May 8-May 10)</li>
</ul>
<h4>34th and O Street (Southwest Corner)</h4>
<ul>
<li>Roadway excavation, aggregate base and geofabric (May 8)</li>
<li>Install cement base (May 8-May 9)</li>
<li>Install granite curb, wheelchair ramps, brick gutter and brick sidewalk (May 14-May 18)</li>
</ul>
]]></content:encoded>
			<wfw:commentRss></wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>April 18 Update</title>
		<link>http://fixingoandpstreets.com/april-18-update/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=april-18-update</link>
		<comments>http://fixingoandpstreets.com/april-18-update/#comments</comments>
		<pubDate>Wed, 18 Apr 2012 20:54:39 +0000</pubDate>
		<dc:creator>mhughes</dc:creator>
				<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://fixingoandpstreets.com/?p=417</guid>
		<description><![CDATA[<h2>Look-Ahead Update</h2>
<h3>Special Notes:</h3>
<ul>
	<li>
<h2 style="text-align: left;"><span style="color: #ff0000;"> Construction crews will be working on the <em>north side</em> of the 3400 block of O Street from April 18 – 20. Work will then shift to the <em>south side</em> of the 3400 block of O Street the week of April 23.
</span></h2>
</li>
	<li>
<h2><span style="color: #ff0000;">Crews continue to remove streetcar tracks from the 3200 &#38; 3300 blocks of O Street in an effort to determine the status of the historic rails - what can be refurbished for reuse and what will need to be fabricated. By doing this, the Project Team will be able to ensure speedy production of new rails and ultimately expedite the progress on those final blocks.
</span></h2>
</li>
</ul>
<h3>Updated 4-18-12:</h3>
<ul>
	<li>
<h2>All scheduled dates shown are dependent on weather conditions and subject to change.

<img class="aligncenter size-full wp-image-419" title="Two Week Look Ahead 04-18-12-01" src="http://fixingoandpstreets.com/wp-content/uploads/2012/04/Two-Week-Look-Ahead-04-18-12-011.jpg" alt="" width="550" height="177" /></h2>]]></description>
			<content:encoded><![CDATA[<h2>Look-Ahead Update</h2>
<h3>Special Notes:</h3>
<ul>
<li>
<h2 style="text-align: left;"><span style="color: #ff0000;"> Construction crews will be working on the <em>north side</em> of the 3400 block of O Street from April 18 – 20. Work will then shift to the <em>south side</em> of the 3400 block of O Street the week of April 23.<br />
</span></h2>
</li>
<li>
<h2><span style="color: #ff0000;">Crews continue to remove streetcar tracks from the 3200 &amp; 3300 blocks of O Street in an effort to determine the status of the historic rails &#8211; what can be refurbished for reuse and what will need to be fabricated. By doing this, the Project Team will be able to ensure speedy production of new rails and ultimately expedite the progress on those final blocks.<br />
</span></h2>
</li>
</ul>
<h3>Updated 4-18-12:</h3>
<ul>
<li>
<h2>All scheduled dates shown are dependent on weather conditions and subject to change.</h2>
<p><img class="aligncenter size-full wp-image-419" title="Two Week Look Ahead 04-18-12-01" src="http://fixingoandpstreets.com/wp-content/uploads/2012/04/Two-Week-Look-Ahead-04-18-12-011.jpg" alt="" width="550" height="177" /></li>
</ul>
<h2>Location &amp; Work</h2>
<h3>P Street:</h3>
<h4>3200 Block of P Street (South Side)</h4>
<ul>
<li>Install streetcar tracks (April 18-April 27)</li>
<li>Install cobblestone on roadway and gutter (April 18-April 27)</li>
<li>Install brick sidewalk, driveways and alleys (April 18-April 25)</li>
<li>Install cement base at tracks (April 23)</li>
<li>Install street light foundations (April 23-April 27)</li>
</ul>
<h4>33rd and P Street (Southeast Corner)</h4>
<ul>
<li>Install curb, wheelchair ramps, brick gutter and brick sidewalk (April 18)</li>
<li>Remove traffic barriers (April 18)</li>
</ul>
<h3>O Street:</h3>
<h4>3200 Block of O Street (South Side)</h4>
<ul>
<li>Remove streetcar tracks, manholes and junction boxes (April 23-April 24)</li>
</ul>
<h4>33rd and O Street (Northeast Corner)</h4>
<ul>
<li>Roadway excavation, aggregate base and geofabric (April 18-April 20)</li>
<li>Install cement base (April 20)</li>
<li>Install curb, wheelchair ramps, brick gutter and brick sidewalk (April 23-April 27)</li>
<li>Remove traffic barriers (April 27)</li>
</ul>
<h4>3300 Block of O Street (North Side)</h4>
<ul>
<li>Set traffic barriers (April 18)</li>
<li>Remove streetcar tracks, manholes and junction boxes (April 18-April 20)</li>
<li>Remove cobblestones and bluestone curb (April 18-April 20)</li>
<li>Roadway excavation, aggregate base and geofabric (April 18-April 27)</li>
<li>Install electrical conduit (April 18-April 20)</li>
</ul>
<h4>3400 Block of O Street (North Side)</h4>
<ul>
<li>Install streetcar tracks (April 18-April 20)</li>
<li>Install cobblestones on roadway and gutter (April 18-April 20)</li>
<li>Install street light foundations (April 23-April 27)</li>
</ul>
<h4>3400 Block of O Street (South Side)</h4>
<ul>
<li>Install streetcar tracks (April 23-April 27)</li>
<li>Switch traffic barriers (April 23)</li>
<li>Remove cobblestones and curb (April 23-April 27)</li>
<li>Roadway excavation, aggregate base and geofabric (April 23-April 27)</li>
</ul>
]]></content:encoded>
			<wfw:commentRss></wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>April 10 Update</title>
		<link>http://fixingoandpstreets.com/april-10-update/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=april-10-update</link>
		<comments>http://fixingoandpstreets.com/april-10-update/#comments</comments>
		<pubDate>Tue, 10 Apr 2012 21:03:16 +0000</pubDate>
		<dc:creator>mhughes</dc:creator>
				<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://fixingoandpstreets.com/?p=407</guid>
		<description><![CDATA[<h2>Look-Ahead Update</h2>
<h3>Special Notes:</h3>
<ul>
	<li>
<h2 style="text-align: left;"><span style="color: #ff0000;"> Construction is scheduled from April 9<sup>-13 </sup>on the 3200 block of O Street and from April 16-20 on the 3300 block of O Street. Crews will be removing streetcar rail tracks to determine the status of the historic rails, which can be refurbished for use, and which will need to be fabricated.  By doing this, the Project Team will be able to ensure speedy production of new rails and ultimately expedite the progress on those final blocks.
</span></h2>
</li>
	<li>
<h2><span style="color: #ff0000;">The Project Team is also pleased to announce that construction on 3300 block of P Street is still scheduled for completion the week of April 9.
</span></h2>
</li>
</ul>
<h3>Updated 4-10-12:</h3>
<ul>
	<li>
<h2>All scheduled dates shown are dependent on weather conditions and subject to change.</h2>
</li>
</ul>
<h2><img class="aligncenter size-full wp-image-411" title="Two Week Look Ahead 04-10-12-01-01" src="http://fixingoandpstreets.com/wp-content/uploads/2012/04/Two-Week-Look-Ahead-04-10-12-01-012.jpg" alt="" width="550" height="177" /></h2>]]></description>
			<content:encoded><![CDATA[<h2>Look-Ahead Update</h2>
<h3>Special Notes:</h3>
<ul>
<li>
<h2 style="text-align: left;"><span style="color: #ff0000;"> Construction is scheduled from April 9<sup>-13 </sup>on the 3200 block of O Street and from April 16-20 on the 3300 block of O Street. Crews will be removing streetcar rail tracks to determine the status of the historic rails, which can be refurbished for use, and which will need to be fabricated.  By doing this, the Project Team will be able to ensure speedy production of new rails and ultimately expedite the progress on those final blocks.<br />
</span></h2>
</li>
<li>
<h2><span style="color: #ff0000;">The Project Team is also pleased to announce that construction on 3300 block of P Street is still scheduled for completion the week of April 9.<br />
</span></h2>
</li>
</ul>
<h3>Updated 4-10-12:</h3>
<ul>
<li>
<h2>All scheduled dates shown are dependent on weather conditions and subject to change.</h2>
</li>
</ul>
<h2><img class="aligncenter size-full wp-image-411" title="Two Week Look Ahead 04-10-12-01-01" src="http://fixingoandpstreets.com/wp-content/uploads/2012/04/Two-Week-Look-Ahead-04-10-12-01-012.jpg" alt="" width="550" height="177" /></h2>
<h2>Location &amp; Work</h2>
<h3>P Street:</h3>
<h4>3200 Block of P Street (South Side)</h4>
<ul>
<li>Install streetcar track rails (April 10-April 20)</li>
<li>Install cobblestone on roadway and gutter (April 10-April 20)</li>
<li>Install brick sidewalk and driveways (April 10-April 20)</li>
<li>Install foundations (April 16-April 20)</li>
</ul>
<h4>3300 Block of P Street (North Side)</h4>
<ul>
<li>Install cobblestones (April 10-April 11)</li>
<li>Remove maintenance of traffic barriers (April 12)</li>
</ul>
<h4>33rd and P Street (South East Corner)</h4>
<ul>
<li>Set maintenance of traffic barriers (April 10)</li>
<li>Roadway excavation (April 10-April 12)</li>
<li>Install electrical conduit (April 10-April 11)</li>
<li>Install cement base (April 13)</li>
<li>Install granite curb, wheelchair ramps, brick gutter and brick sidewalk (April 16-April 20)</li>
<li>Remove maintenance of traffic barriers (April 20)</li>
</ul>
<h3>O Street:</h3>
<h4>3200 Block of O Street (South Side)</h4>
<ul>
<li>Continue work on electric conduits and manholes (April 10-April 11)</li>
<li>Remove streetcar rail tracks, manholes and junction boxes (April 10-April 13)</li>
</ul>
<h4>3300 Block of O Street (North Side)</h4>
<ul>
<li>Set maintenance of traffic barriers (April 16)</li>
<li>Remove streetcar track rails, manholes and junction boxes (April 16-April 20)</li>
<li>Remove cobblestones (April 16-April 19)</li>
</ul>
<h4>3400 Block of O Street (North Side)</h4>
<ul>
<li>Install streetcar track rails (April 10-April 20)</li>
<li>Install foundations (April 16-20)</li>
<li>Install cobblestones on roadway and gutter (April 10-April 20)</li>
</ul>
]]></content:encoded>
			<wfw:commentRss></wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>March 28 Update</title>
		<link>http://fixingoandpstreets.com/march-28-update/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=march-28-update</link>
		<comments>http://fixingoandpstreets.com/march-28-update/#comments</comments>
		<pubDate>Wed, 28 Mar 2012 21:01:11 +0000</pubDate>
		<dc:creator>mhughes</dc:creator>
				<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://fixingoandpstreets.com/?p=389</guid>
		<description><![CDATA[<h2>Look-Ahead Update</h2>
<h3>Special Notes:</h3>
<ul>
	<li>
<h2><span style="color: #ff0000;"> The Project Team is pleased to announce that construction on 3300 block of P Street is scheduled for completion on or about the week of April 9th. </span></h2>
</li>
	<li>
<h2><span style="color: #ff0000;">Parking will be temporarily restricted on the 3400 block of P Street from Monday, April 2– Wednesday, April 4 while the crew applies the final layers of grout needed to seal the historic rail.  The block will be open to through traffic, but there will be no parking allowed during these days.  Please check <a href="../">http://fixingoandpstreets.com</a> for daily parking updates.
</span></h2>
</li>
</ul>
<h3>Updated 3-28-12:</h3>
<ul>
	<li>
<h2>All scheduled dates shown are dependent on weather conditions and subject to change.

<img class="aligncenter size-full wp-image-392" title="Two Week Look Ahead 03-28-12-01" src="http://fixingoandpstreets.com/wp-content/uploads/2012/03/Two-Week-Look-Ahead-03-28-12-011.jpg" alt="" width="550" height="177" /></h2>]]></description>
			<content:encoded><![CDATA[<h2>Look-Ahead Update</h2>
<h3>Special Notes:</h3>
<ul>
<li>
<h2><span style="color: #ff0000;"> The Project Team is pleased to announce that construction on 3300 block of P Street is scheduled for completion on or about the week of April 9th. </span></h2>
</li>
<li>
<h2><span style="color: #ff0000;">Parking will be temporarily restricted on the 3400 block of P Street from Monday, April 2 – Wednesday, April 4 while the crew applies the final layers of grout needed to seal the historic rail.  The block will be open to through traffic, but there will be no parking allowed during these days.  Please check <a href="../">http://fixingoandpstreets.com</a> for daily parking updates.<br />
</span></h2>
</li>
</ul>
<h3>Updated 3-28-12:</h3>
<ul>
<li>
<h2>All scheduled dates shown are dependent on weather conditions and subject to change.</h2>
<p><img class="aligncenter size-full wp-image-392" title="Two Week Look Ahead 03-28-12-01" src="http://fixingoandpstreets.com/wp-content/uploads/2012/03/Two-Week-Look-Ahead-03-28-12-011.jpg" alt="" width="550" height="177" /></li>
</ul>
<h2>Location &amp; Work</h2>
<h3>P Street:</h3>
<h4>3200 Block of P Street (North Side)</h4>
<ul>
<li>Installation of cobblestones on the roadway (March 28-March 30)</li>
<li>Demolition of cement (March 28-March 29)</li>
<li>Installation of streetcar track rails (March 28-March 30)</li>
<li>Installation of brick sidewalk (March 28-March 30)</li>
<li>Installation of streetlight foundations (March 28-March 30)</li>
</ul>
<h4>3300 Block of P Street (North Side)</h4>
<ul>
<li>Installation of cobblestones (March 28-March 30)</li>
</ul>
<h3>O Street:</h3>
<h4>3200 Block of O Street (South Side)</h4>
<ul>
<li>Installation of electrical piping system  (March 28-March 30)</li>
<li>Installation of manholes (March 28-March 30)</li>
</ul>
<h4>3400 Block of O Street (North Side)</h4>
<ul>
<li>Installation of streetcar track rails (March 28-March 30)</li>
<li>Installation of brick sidewalk (March 28-30)</li>
<li>Installation of cobblestones, roadway and gutter (March 28-March 30)</li>
</ul>
<h4>3<sup>4th </sup>and O Street Intersection</h4>
<ul>
<li>Installation of cement (March 28)</li>
</ul>
]]></content:encoded>
			<wfw:commentRss></wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>March 6 Update</title>
		<link>http://fixingoandpstreets.com/march-6-update/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=march-6-update</link>
		<comments>http://fixingoandpstreets.com/march-6-update/#comments</comments>
		<pubDate>Tue, 06 Mar 2012 22:25:09 +0000</pubDate>
		<dc:creator>mhughes</dc:creator>
				<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://fixingoandpstreets.com/?p=369</guid>
		<description><![CDATA[<h2>Look-Ahead Update</h2>
<h3>Special Notes:</h3>
<ul>
	<li>
<h2><span style="color: #ff0000;"> On behalf of the District of Columbia Department of Public Works (DPW), the Project Team and your ANC want to remind residents that trash and recycling must be stored in proper containers or you could be issued a solid waste ticket.  For those blocks impacted by project work, DPW asks residents to deliver containers to the corner for pick-up.  <a href="http://dpw.dc.gov/DC/DPW/Services+on+Your+Block/All+Services/Residential+Trash+Collection">For questions, visit the DPW website</a>. </span></h2>
</li>
</ul>
<h3>Updated 3-06-12:</h3>
<ul>
	<li>
<h2>All scheduled dates shown are dependent on weather conditions and subject to change.</h2>
</li>
</ul>
<h2><img class="aligncenter size-full wp-image-370" title="Two Week Look Ahead 03-06-12-01" src="http://fixingoandpstreets.com/wp-content/uploads/2012/03/Two-Week-Look-Ahead-03-06-12-01.jpg" alt="" width="550" height="177" /></h2>]]></description>
			<content:encoded><![CDATA[<h2>Look-Ahead Update</h2>
<h3>Special Notes:</h3>
<ul>
<li>
<h2><span style="color: #ff0000;"> On behalf of the District of Columbia Department of Public Works (DPW), the Project Team and your ANC want to remind residents that trash and recycling must be stored in proper containers or you could be issued a solid waste ticket.  For those blocks impacted by project work, DPW asks residents to deliver containers to the corner for pick-up.  <a href="http://dpw.dc.gov/DC/DPW/Services+on+Your+Block/All+Services/Residential+Trash+Collection">For questions, visit the DPW website</a>. </span></h2>
</li>
</ul>
<h3>Updated 3-06-12:</h3>
<ul>
<li>
<h2>All scheduled dates shown are dependent on weather conditions and subject to change.</h2>
</li>
</ul>
<h2><img class="aligncenter size-full wp-image-370" title="Two Week Look Ahead 03-06-12-01" src="http://fixingoandpstreets.com/wp-content/uploads/2012/03/Two-Week-Look-Ahead-03-06-12-01.jpg" alt="" width="550" height="177" /></h2>
<h2>Location &amp; Work</h2>
<h3>P Street:</h3>
<h4>3200 Block of P Street (North Side)</h4>
<ul>
<li>Installation of brick sidewalk, cobblestone, driveways (March 6-March 9)</li>
<li>Excavation of roadway, installation of GAB &amp; PCC base (March 6-March 9)</li>
<li>Set Bluestones (March 6-March 9)</li>
<li>Installation of electrical manholes and conduits (March 6-March 9)</li>
</ul>
<h4>3300 Block of P Street (North Side)</h4>
<p>Work on the 3300 block of P Street continues, but has slowed due to an unexpected snag.  When the historic rails were removed, it was discovered that they were in far worse shape than expected, and many were entirely unusable.  Replacing these damaged tracks required a change in scope and budget to the original contract so that new rails could be fabricated.  We&#8217;re pleased to say that the fabrication process was approved and is already underway.  As the Project Team awaits the arrival of these fabricated rails – estimated delivery to site is early April – work must continue on other blocks to keep the overall project on schedule.  The Project Team continues to evaluate the quality of track currently being removed from other blocks.  Should any of those tracks be in useable shape, the 3300 block of P Street will take first priority, and after the proper rehabilitation, those rails will immediately be installed.</p>
<p>The Project Team is doing their best to re-open any portions of the 3300 block of P Street, and recently one-quarter of the block was opened for parking and expanded through traffic.  We will continue to look for ways to accommodate residential needs where we can, and thank you for your patience.</p>
<h3>O Street:</h3>
<h4>3400 Block of O Street (North Side)</h4>
<ul>
<li>Removal of streetcar track rails, manholes and junction boxes (March 6-March 9)</li>
<li>Removal of cobblestones (March 6-March 9)</li>
<li>Excavation of roadway, installation of GAB and Geofabric material (March 6-March 9)</li>
</ul>
<h4>33<sup>rd </sup>and O Street Intersection</h4>
<ul>
<li>Installation of electrical manholes and conduits (March 6-March 9)</li>
</ul>
]]></content:encoded>
			<wfw:commentRss></wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>February 24 Update</title>
		<link>http://fixingoandpstreets.com/february-24-update/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=february-24-update</link>
		<comments>http://fixingoandpstreets.com/february-24-update/#comments</comments>
		<pubDate>Fri, 24 Feb 2012 21:47:17 +0000</pubDate>
		<dc:creator>mhughes</dc:creator>
				<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://fixingoandpstreets.com/?p=358</guid>
		<description><![CDATA[<h2>Look-Ahead Update</h2>
<h3>Special Notes:</h3>
<ul>
	<li>
<h2><span style="color: #ff0000;">Work is scheduled to begin on the 3400 Block of O Street on or around Monday, February 27, 2012</span></h2>
</li>
	<li>
<h2><span style="color: #ff0000;">A night time water shut off is currently scheduled for February 28, 2012 at the intersection of Wisconsin Avenue and O Street. DC Water will notify all impacted customers with more details</span></h2>
</li>
</ul>
<h3>Updated 2-24-12:</h3>
<ul>
	<li>
<h2>All scheduled dates shown are dependent on weather conditions and subject to change.</h2>
</li>
</ul>
<h2><img class="aligncenter size-full wp-image-359" title="Two Week Look Ahead 02-24-12-01" src="http://fixingoandpstreets.com/wp-content/uploads/2012/02/Two-Week-Look-Ahead-02-24-12-01.jpg" alt="" width="550" height="177" /></h2>]]></description>
			<content:encoded><![CDATA[<h2>Look-Ahead Update</h2>
<h3>Special Notes:</h3>
<ul>
<li>
<h2><span style="color: #ff0000;">Work is scheduled to begin on the 3400 Block of O Street on or around Monday, February 27, 2012</span></h2>
</li>
<li>
<h2><span style="color: #ff0000;">A night time water shut off is currently scheduled for February 28, 2012 at the intersection of Wisconsin Avenue and O Street. DC Water will notify all impacted customers with more details</span></h2>
</li>
</ul>
<h3>Updated 2-24-12:</h3>
<ul>
<li>
<h2>All scheduled dates shown are dependent on weather conditions and subject to change.</h2>
</li>
</ul>
<h2><img class="aligncenter size-full wp-image-359" title="Two Week Look Ahead 02-24-12-01" src="http://fixingoandpstreets.com/wp-content/uploads/2012/02/Two-Week-Look-Ahead-02-24-12-01.jpg" alt="" width="550" height="177" /></h2>
<h2>Location &amp; Work</h2>
<h3>P Street:</h3>
<h4>3200 Block of P Street (North Side)</h4>
<ul>
<li>Installation of electrical conduits and manhole (February 27 – March 2)</li>
<li>Installation of PCC base (February 27)</li>
</ul>
<h4>33rd and P Street Northwest Intersection</h4>
<ul>
<li>Excavation of roadway; installation of GAB and Geofabric material (February 27 – February 29)</li>
<li>Electrical work (February 27)</li>
</ul>
<h3>O Street:</h3>
<h4>3200 Block of O Street (North Side) between Potomac Street and Wisconsin Avenue</h4>
<ul>
<li>Water service replacement – South Side (February 27)</li>
<li>Water service replacement – North Side (February 27)</li>
<li>Preparation for water main tie-in (February 27 – February 28)</li>
<li><em>Night water main shutdown and tie-in (February 28)</em></li>
<li>Backfill water main (February 29)</li>
</ul>
<h4>3400 Block of O Street (North Side)</h4>
<ul>
<li>Installation of maintenance of traffic barriers (February 27)</li>
<li>Remove streetcar track rails, manholes and junction boxes (February 28 – March 2)</li>
<li>Remove cobblestones (February 28 – March 2)</li>
</ul>
]]></content:encoded>
			<wfw:commentRss></wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>February 14 Update</title>
		<link>http://fixingoandpstreets.com/february2-update/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=february2-update</link>
		<comments>http://fixingoandpstreets.com/february2-update/#comments</comments>
		<pubDate>Tue, 31 Jan 2012 22:17:15 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://fixingoandpstreets.com/?p=326</guid>
		<description><![CDATA[<strong>Look-Ahead Update</strong>
<em><strong> Special Notes:</strong></em>
<em><span style="color: #ff0000;">*Intersection of 34th and P Street now OPEN</span></em>
<em><span style="color: #ff0000;"> *Completed section of roadway on the 3300 Block of P Street (North Side) scheduled to OPEN on or about February 22</span></em>

<strong>Updated 2-14-12:</strong>
<em>*All scheduled dates shown are dependent on weather conditions and subject to change.</em>
<img class="aligncenter size-large wp-image-338" title="Two Week Look Ahead 02-14-12" src="http://fixingoandpstreets.com/wp-content/uploads/2012/01/Two-Week-Look-Ahead-02-14-12-578x186.png" alt="" width="578" height="186" />]]></description>
			<content:encoded><![CDATA[<p><strong>Look-Ahead Update</strong><br />
<em><strong> Special Notes:</strong></em><br />
<em><span style="color: #ff0000;">*Intersection of 34th and P Street now OPEN</span></em><br />
<em><span style="color: #ff0000;"> *Completed section of roadway on the 3300 Block of P Street (North Side) scheduled to OPEN on or about February 22</span></em></p>
<p><strong>Updated 2-14-12:</strong><br />
<em>*All scheduled dates shown are dependent on weather conditions and subject to change.</em><br />
<img class="aligncenter size-large wp-image-338" title="Two Week Look Ahead 02-14-12" src="http://fixingoandpstreets.com/wp-content/uploads/2012/01/Two-Week-Look-Ahead-02-14-12-578x186.png" alt="" width="578" height="186" /><br />
<strong>Location &amp; Work:</strong><br />
<span style="text-decoration: underline;">P Street</span><br />
3200 Block of P Street (North Side)<br />
• Installation of electrical conduits and manhole (February 16-February 24)<br />
• Installation of maintenance of traffic barriers toward Wisconsin Avenue (February 20)<br />
• Removal of cobblestones and bluestone curb (February 14-February 17)<br />
• Excavation of roadway; installation of GAB and Geofabric material (February 15-February 24)<br />
• Removal of streetcar track rails, manhole and junction boxes (February 14-February 17)</p>
<p>3300 Block of P Street (North Side)<br />
• Installation of PCC base (February 14)<br />
• Installation of cobblestone on roadway and gutter (February 14-February 24)<br />
• Installation of street light foundations (February 22-February 24)<br />
• <em>Open completed section of the roadway (February 22)</em></p>
<p>33rd and P Street Northwest Intersection<br />
• Set maintenance of traffic barriers (February 20)<br />
• Excavation of roadway; installation of GAB and Geofabric material (February 21-February 24)<br />
• Installation of PCC base (February 24)</p>
<p>34th and P Street (Northeast Side)<br />
• Installation of granite cub, wheelchair ramps, brick gutter and brick sidewalk (February 14-February 17)<br />
• Installation of street light foundations (February 22-February 24)<br />
• <em>Open Intersection (February 14)</em></p>
<p><span style="text-decoration: underline;">O Street</span><br />
3200 Block of O Street (North Side) between Potomac Street and Wisconsin Avenue<br />
• Water service replacement – South Side (February 14-February 17)<br />
• Water service replacement – North Side (February 20-February 24)<br />
• Installation of fire hydrant (February 14)</p>
]]></content:encoded>
			<wfw:commentRss></wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>January 23 Update</title>
		<link>http://fixingoandpstreets.com/january-23-update/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=january-23-update</link>
		<comments>http://fixingoandpstreets.com/january-23-update/#comments</comments>
		<pubDate>Mon, 23 Jan 2012 22:58:43 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://fixingoandpstreets.com/?p=315</guid>
		<description><![CDATA[<em>Look-Ahead Update</em>
<em> Special Notes:</em>
<span style="color: #ff0000;"><em> * A night time water shut off is currently scheduled on February 2 for the 3200 block of O Street. DC Water will notify all impacted customers with more details.*</em></span>
<em> *Saturday work is currently scheduled for January 28.*</em>

<img class="aligncenter size-large wp-image-317" title="Look Ahead 1-23-12-01" src="http://fixingoandpstreets.com/wp-content/uploads/2012/01/Look-Ahead-1-23-12-01-578x186.png" alt="" width="578" height="186" />]]></description>
			<content:encoded><![CDATA[<p><em>Look-Ahead Update</em><br />
<em> Special Notes:</em><br />
<span style="color: #ff0000;"><em> * A night time water shut off is currently scheduled on February 2 for the 3200 block of O Street. DC Water will notify all impacted customers with more details.*</em></span><br />
<em> *Saturday work is currently scheduled for January 28.*</em></p>
<p><img class="aligncenter size-large wp-image-317" title="Look Ahead 1-23-12-01" src="http://fixingoandpstreets.com/wp-content/uploads/2012/01/Look-Ahead-1-23-12-01-578x186.png" alt="" width="578" height="186" /></p>
<p>Updated 1-23-12<br />
<em>• All scheduled dates shown are dependent on weather conditions and may change.</em></p>
<p>Location &amp; Work:</p>
<p><span style="text-decoration: underline;">P Street</span><br />
3400 Block of P Street (North Side)<br />
• Preparation of PCC Base for the tracks (January 24)<br />
• Installation of PCC Base tracks (January 24)<br />
• Installation of Cobblestones and Streetcar Tracks (January 26-February 3)</p>
<p>3300 Block of P Street (North Side)<br />
• Installation of streetcar track, junction boxes and manholes (January 24-February 3)<br />
• Installation of cobblestone (Roadway and Gutter) (January 24-February 3)<br />
• Installation of driveway and brick sidewalk (January 25-28)<br />
• Preparation for PCC base for the tracks (January 24-28)</p>
<p>34th and P Street (Northwest Side)<br />
• Preparation of PCC base (January 24)<br />
• Installation of PCC Base (January 24-25)<br />
• Installation of granite curb, wheelchair ramps, brick gutter and brick sidewalk (January 27- February 3)</p>
<p>34th and P Street (Northeast Side)<br />
• Installation of maintenance of traffic barriers (January 30)<br />
• Excavation of roadway; installation of GAB and Geofabric material (January 30-February 3)<br />
• Installation of electrical conduits (January 31-February 1)</p>
<p>33rd and P street Intersection<br />
• Installation of 12” watermain (Southeast and Northeast Side) (January 24-28)</p>
<p><span style="text-decoration: underline;">O Street</span><br />
3200 Block of O Street (North Side)<br />
• Installation of 12” watermain (January 24-28)<br />
• Installation of catch basin 50 and PCC pipes (January 30- February 3)<br />
• 12” watermain pressure test and chlorination (January 24-28)<br />
• Preparation for tie-in and shutdown (January 31- February 2)<br />
• Night time shut down (February 2)<br />
• Installation of in-line thrust block and backfill trench (February 3)</p>
<p>33rd Street and O Street Intersection<br />
• Water Service replacement (January 30-31)</p>
]]></content:encoded>
			<wfw:commentRss></wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>January 19 Update</title>
		<link>http://fixingoandpstreets.com/january-19-update/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=january-19-update</link>
		<comments>http://fixingoandpstreets.com/january-19-update/#comments</comments>
		<pubDate>Thu, 19 Jan 2012 22:43:52 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://fixingoandpstreets.com/?p=310</guid>
		<description><![CDATA[<em><strong>Look-Ahead Update</strong></em>
<em><strong> Special Notes:</strong></em>
<em>The NORTH side of the 3400 Block of P Street will be closed to traffic for the next several weeks.</em>
<em> Saturday work is currently scheduled for January 21 and January 28.</em>

<img class="aligncenter size-large wp-image-311" title="Look Ahead 1-1912-01" src="http://fixingoandpstreets.com/wp-content/uploads/2012/01/Look-Ahead-1-1912-01-578x186.png" alt="" width="578" height="186" />]]></description>
			<content:encoded><![CDATA[<p><em><strong>Look-Ahead Update</strong></em><br />
<em><strong> Special Notes:</strong></em><br />
<em>The NORTH side of the 3400 Block of P Street will be closed to traffic for the next several weeks.</em><br />
<em> Saturday work is currently scheduled for January 28.</em></p>
<p><img class="aligncenter size-large wp-image-311" title="Look Ahead 1-1912-01" src="http://fixingoandpstreets.com/wp-content/uploads/2012/01/Look-Ahead-1-1912-01-578x186.png" alt="" width="578" height="186" /></p>
<p><strong>Updated 1-19-12</strong><br />
<em>• All scheduled dates shown are dependent on weather conditions and may change.</em></p>
<p><strong>Location &amp; Work:</strong></p>
<p><span style="text-decoration: underline;">P Street</span><br />
3400 Block of P Street (North Side)<br />
• Installation of PCC Base (January 20)<br />
• Installation of Cobblestones and Streetcar Tracks (January 23-January 28)</p>
<p>3300 Block of P Street (North Side)<br />
• Installation of cobblestone (Roadway and Gutter) (January 20-28)<br />
• Installation of driveway and brick sidewalk (January 20-28)</p>
<p>34th and P Street (Northwest Side)<br />
• Excavation of roadway; Installation of GAB and Geofabric material (January 20)<br />
• Installation of PCC Base (January 20)<br />
• Installation of granite curb, wheelchair ramps, brick gutter and brick sidewalk (January 23-28)</p>
<p>33rd and P Street (Northwest Side)<br />
• Installation of 12” watermain (Southeast and Northeast Side) (January 20)<br />
• Close intersection (January 24)<br />
• Excavation of roadway; Installation of GAB and Geofabric materials (January 25-28)</p>
<p><span style="text-decoration: underline;">O Street</span><br />
3200 Block of O Street (North Side)<br />
• Installation of 12” watermain (January 20)<br />
• Installation of catch basin 50 and PCC pipes (January 20-28)<br />
• 12” watermain pressure test and chlorination (January 20-26)<br />
• Water service replacement (January 20-28)</p>
<p><span style="text-decoration: underline;">33rd Street</span><br />
1400 Block of 33rd Street<br />
• Installation of alley entrance (West Side) (January 20)</p>